Move from Nutanix to any cloud
Nutanix AHV Any Cloud

Move from Nutanix to any cloud. Faster, safer, fully automated.

Concierto Migrate replaces spreadsheets, manual cutover windows, and toolchain sprawl with a single automated platform — from agentless discovery to post-cutover health checks.

<24h
Discovery & Assessment
~0
Agents installed
<15m
Final cutover delta

Request a Proof of Value

We complete discovery and full assessment of your Nutanix cluster in under 24 hours from tenant provisioning

By submitting your information, you agree to our revised  Privacy Statement.

Concierto: Trusted by Leading Organizations Across Industries

80+ enterprises onboarded in last 6 months with multi-region deployments at global scale

Four-Phase Workflow

Every step automated.
No data re-entry between stages.

1

Discovery & Assessment

Agentless IP-range scan auto-populates CMDB, maps application dependencies, classifies migration strategy per VM, and pulls live cloud pricing across AWS, Azure, and GCP.

WinRM / SSH R-Factor TCO Report
2

Landing Zone

Connect your target cloud account via secure role-based access — no long-lived keys stored. Map virtual networks, subnets, and security groups within the Concierto UI.

Cloud KMS Encrypted Volumes No cloud console
3

Move Groups

Workloads grouped by OS and role — DB tier replicates first, App tier follows. Dependency sequencing is enforced automatically with CAB approval built in.

CAB Workflow Dependency Order Wave Planning
4

Execution & Cutover

Full replication → incremental CBT sync → automated cutover sequence → post-cutover health checks. Source VMs powered off, never deleted — rollback ready.

CBT / VSS 7-step Cutover Zero data loss
Key Capabilities

Comprehensive Nutanix migrations.

Eight capabilities that address the exact failure modes of Nutanix-to-cloud migrations — dependency blind spots, governance gaps, and cutover risk.

Automatic Application Dependency Mapping

TCP session analysis across every discovered VM auto-constructs a full application topology — written directly to the integrated CMDB. No interviews, no spreadsheets.

  • Inbound & outbound TCP connections normalised and deduplicated
  • Interactive node-link map: App tier ↔ DB tier ↔ Shared services
  • Edges annotated by protocol — HTTP/S, SQL, SSH, RDP
  • CMDB records auto-created with upstream/downstream dependency links
  • Exported to assessment report for stakeholder sign-off
Zero-Touch Discovery

No agents installed. Windows VMs via WinRM port 5986; Linux via SSH port 22. Discovery of an entire Nutanix cluster completes in under 48 hours from provisioning.

R-Factor Intelligence

Every VM receives an automated migration strategy — Rehost, Re-platform, Re-factor, Retain, or Retire — based on OS version, EOL status, and active connections.

Right-Sized Cloud Pricing

P95 CPU and memory utilisation drives cloud instance selection. Live provider pricing across AWS, Azure, and GCP delivers On-Demand, committed use, and reserved pricing per VM at assessment time.

Cloud Best-Practice Landing Zone

Role-based access with ephemeral credentials — no long-lived keys. Encryption at rest enforced. Network CIDR overlap check. Migration security group auto-created and auto-deleted post-cutover.

Near-Zero Downtime

Full replication followed by continuous incremental delta sync (CBT/VSS) keeps target cloud volumes current. Final cutover delta is typically minutes. Bandwidth throttle configurable per environment.

Execution Safety

A rollback path at every step.
Not just at the end.

Source Nutanix VMs are powered off — never deleted — at cutover. If any post-cutover health check fails, the source is available for immediate restart with zero data loss.

1
Full Replication

VSS / LVM snapshot; block-level transfer via TLS 1.3; checksum validated on completion.

2
Incremental Delta Sync

CBT cycles every 15–60 min; migration lag monitored; alert if lag exceeds configurable threshold.

3
Pre-Cutover Validation

Lag must be <15 min; source health checks must pass; Landing Zone config confirmed unchanged.

4
Source Quiesce

DB flush + sync; app connection drain (30 s – 5 min); application-consistent state before final delta.

5
Final Delta + Source Power-Off

Last sync; target volume checksum matches quiesced source. Source VM powered off via Prism Central API.

6
Cloud VM Launch + DNS Update

Cloud VMs launched in Landing Zone; volumes attached; DNS updated to target IPs.

7
Post-Cutover Health Checks

DB port test, query execution, row-count check. App HTTP/S check + App→DB connectivity. Move Group marked COMPLETE.

Rollback (if needed)

Source VM still intact. Engineer restarts via Prism Central. Application recovers from preserved source state. Zero data loss.

Dry Run Mode

Simulate the full replication workflow without moving data — validate the plan before committing to production cutover.

Ready to see Concierto Migrate
against your Nutanix environment?

Request a Proof of Value — we complete discovery and full assessment of your Nutanix cluster in under 24 hours from tenant provisioning.

Request a Proof of Value